
After a
very fast and long ride on the back of
Ceans Scooter we arrived at the building site of the units being built of which he has taken out a mortgage contract already for the 9
th floor, the picture below shows what
the building will look like this
being across the road the pictures below are taken very close the the
buildings. rice paddy fields and the viaduct is what the Very Fast Train runs on from top of Taiwan to bottom
No comments:
Post a Comment